Volume 15, Issue 10 (1-2016)                   Modares Mechanical Engineering 2016, 15(10): 249-258 | Back to browse issues page

XML Persian Abstract Print


Download citation:
BibTeX | RIS | EndNote | Medlars | ProCite | Reference Manager | RefWorks
Send citation to:

Khalilzadeh Bavil V, Mahmoudimehr J. Modeling and optimization of the quasi-steady operation of a Solar Power Plant equipped with thermal energy storage system. Modares Mechanical Engineering 2016; 15 (10) :249-258
URL: http://mme.modares.ac.ir/article-15-3053-en.html
1- Department of Mechanical Engineering Faculty of Engineering University of Guilan P.O.Box 3756, Rasht, Iran.
Abstract:   (5972 Views)
This study is concerned with optimizing the daily operation of a solar power plant equipped with thermal energy storage system (TES). The modeling is performed by solving a set of non-linear governing equations and is verified through comparison with the literature. "Maximum production period" and "maximum revenue" constitute the objectives of the optimization study which are first considered individually (as two single-objective problems) and are then considered simultaneously (as a multi-objective problem). Genetic Algorithm (GA) is employed as the optimization tool. The results of the first objective (maximum production period) shows 7 hours increase in the daily production time as a result of employing the TES system. This occurred through saving energy during the times of high solar radiation and using the stored energy for electricity generation during the times of low or zero solar radiation. The results of the second objective (maximum revenue) indicate 13.5% increase in the produced profit as a result of employing the TES system. This improvement was resulted from saving energy during the times of low electricity price and using the stored energy for maximum electricity generation during the times of high electricity price. Finally, in the multi-objective study, 5 hours increase in the production period and 8.1% increase in the revenue were simultaneously obtained as a result of a proper tradeoff between the two objectives.
Full-Text [PDF 504 kb]   (5557 Downloads)    
Article Type: Research Article | Subject: Energy Systems Management
Received: 2015/08/1 | Accepted: 2015/08/26 | Published: 2015/09/14

Add your comments about this article : Your username or Email:
CAPTCHA

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.